- Is the 24-inch footing depth measured from the deck or from the ground?
- From the finished ground surface down to the bottom of the footing. The bottom of the concrete, where it bears on soil, must be at least 24 inches below grade in Boise. On a sloped site, measure at each footing, because the low side and high side can differ by a foot or more and each hole has to meet the depth on its own.
- Does a heavy snow year mean my Boise deck is overloaded?
- Rarely, if it was built to the IRC tables. Boise's design ground snow load is 20 psf and a code-built open deck is designed for 40 psf live load. The risk is local: snow sliding off a roof onto one corner, plowed snow piled on the deck, or older framing that was never built to the tables. Clear those concentrated piles first.
- How do I know if my Boise home is in the WUI overlay?
- The WUI overlay and its IR1 and IR2 zones are shown on Boise's zoning map. IR1 generally covers Foothills fire hazard areas and extends to annexed land north and west of Hill Road; IR2 generally covers valley and desert areas. The Fire Code Official has final authority on boundaries, so confirm your parcel with Planning or Boise Fire before choosing materials.
- How often should a deck be stained in Boise?
- On a sunny Boise deck, a penetrating semi-transparent stain typically needs renewal every two to three years, sooner on south- and west-facing boards. Inspect each spring: if water soaks in instead of beading, or color fades unevenly, it's time. Solid stains last longer on vertical surfaces than on walking surfaces, where foot traffic and freeze-thaw wear them first.
- Do I need HOA approval to replace my deck with the same design?
- Usually, yes, if your CC&Rs require approval for exterior improvements, and most do. A like-for-like replacement is often a quick approval, but changing material from wood to composite, changing color or altering size counts as a change. Submit photos of the existing deck and the replacement specs so the committee can approve it without a full review.
- When should I sign with a deck builder for a spring build in Boise?
- February or March for a deck you want by late spring or early summer. Design, HOA review (often one to six weeks by third-party estimates) and Boise's permit review (typically about two weeks online) all happen before footings go in. Starting in April usually pushes completion into midsummer, especially when contractors' spring calendars are full.