How we build a deck

Six steps, the same on every project. The parts you never see after the boards go down get the most attention.

steps, every project
6
Boise frost depth for footings
24 in
Boise permit trigger above grade
12 in
ground snow load we frame for
20 psf

Offer$500 off + a free 3D layout

Get a deck estimate

All fields are required.

Prefer to talk? Call or text (208) 330-5348

Submitting this form does not book an appointment.

Step by step

What happens, and why

  1. Clipboard with a deck sketch and tape measure resting on an old deck railing

    Estimate request and site measure

    We measure the yard and the wall the deck attaches to, check slope, drainage, utilities and access for equipment, and note anything your HOA or city will ask about. You get options, not a pitch.

  2. Rolled deck construction plans and a permit folder on a workbench

    Design and written estimate

    A layout with board direction, stairs, railing and any cover or pergola, plus a written estimate that names materials, fasteners, permit path and a build window. Changes are easy at this stage and expensive later.

    What decks cost here
  3. Rolled deck construction plans and a permit folder on a workbench

    Permit and HOA approval

    In Boise and Nampa, decks more than 12 inches above grade need a building permit with framing and ledger details; Meridian uses size, attachment and exit-door rules. We prepare drawings and the HOA submittal package (materials, colors, dimensions).

    Permit rules by city
  4. Concrete deck pier footing with a galvanized post base before the post is set

    Footings and framing

    Footings go below Boise's 24-inch frost depth. The ledger is flashed and fastened to the house rim with structural fasteners; joists are spaced for the board you chose and taped where the manufacturer calls for it. Inspections happen before anything is covered.

    Why footings go to 24 inches
  5. Deck under construction with framing complete and the first composite boards installed

    Decking, railing and stairs

    Boards are laid with the gaps your material needs for Treasure Valley temperature swings, railing posts are blocked into the frame, and stairs are built to consistent rise and run with lighting if you want it.

  6. Finished deck swept clean with furniture set out on handoff day

    Final inspection and walkthrough

    We close the permit, clean up, and walk the deck with you — including care for your material through freeze-thaw winters and dry summers.

What we build to

The numbers behind steps 3 and 4

Permit triggers, footing depth and framing loads aren't judgment calls. These are the verified Boise values, with the city and NOAA pages they come from.

Boise design criteria & climate
Permit needed above
12 in
Frost depth
24 in
Ground snow load
20 psf
Design wind
90 mph
Nights ≤ 32°F / yr
108
Annual precip
11.51 in

Sources: City of Boise — Residential Construction brochure; City of Boise — current codes & design criteria; NOAA NCEI U.S. Climate Normals 1991–2020, Boise Air Terminal (USW00024131)

Deck cost calculator

Budget before step one

Pick a size, a material and how high the deck sits. You'll get a Treasure Valley range in seconds — no phone number required to see it.

Open the calculator
Installed cost per sq ft — published 2026 market ranges
MaterialPer sq ft
Pressure-treated pine$25–$40
Western red cedar$30–$48
Capped composite (e.g. Trex, TimberTech, Fiberon)$40–$62
PVC / cellular (e.g. AZEK)$55–$78

Ranges reflect published 2026 Treasure Valley and national installed-cost data, not a Valley Decks quote. Your price depends on size, height, access, footings, railing, stairs and permit scope — we confirm it in writing after an on-site measure. Sources and method: deck cost in Boise.

Read before you build

Guides for each stage

  • Cedar deck behind a North End Boise craftsman bungalow under mature trees

    Permit guide

    Boise, ID Deck Permit Rules (2026)

    Yes, if the deck surface sits more than 12 inches above grade. The City of Boise requires a building permit for any deck or concrete patio over 12…

Questions about the process

Which Treasure Valley cities require a permit for a deck?
All of them set rules, but the thresholds differ. Boise and Nampa require a permit for a deck more than 12 inches above grade. Meridian requires one for decks over 200 square feet, attached to the house, more than one story, or serving an exit door. Eagle requires permits for decks attached to a structure, and Caldwell says decks need separate permits and inspections. The Boise deck permit guide is the most detailed starting point.
Who pulls the deck permit — me or the contractor?
Either can, depending on the arrangement. Boise lets homeowners pull permits for work on their own primary residence. The written estimate should state plainly who is pulling the permit and who schedules the inspections, so nobody assumes the other person did. City-specific steps are in the Meridian, Nampa, Eagle and Caldwell permit guides.
When does deck building season start and end in the Boise area?
Footing work runs most comfortably from spring through fall. NOAA's 1991–2020 normals for the Boise airport put the median last spring freeze on April 24 and the median first fall freeze on October 21. Framing, decking, railing and repair work stretch well past those dates on dry days, so the season for finishing a deck is longer than the season for starting one.
When should I start planning a deck I want finished by summer?
Late winter. Design, permit review and any HOA approval usually take longer than the construction itself, and they can all happen while the ground is still frozen. Starting the design in January or February leaves room for a revision or two and lets footings go in soon after the spring thaw. Our guide to the best time to build a deck in Boise lays out a month-by-month plan.
What changes when a deck is built between November and March?
Mostly the footings and the finish. December and January average 25.2 and 25.5 nights at or below freezing at the Boise airport, so digging is slower and fresh concrete has to be protected while it cures. Composite boards get end gaps set for the cold. Wood stains need warm, dry days, so a wood deck built in winter usually gets its first finish in spring.
More deck building answers

Next step

Ready to price your deck?

Tell us the size, the material you're leaning toward and when you'd like it built. We'll follow up to schedule an on-site measure.

CallGet a deck estimate