Skip to main content
Offer$500 off + a free 3D layout
Valley Decks
Hidden deck fastener clips seated in grooved composite board edges

Material guides

Decking material guides

Side-by-side comparisons built around what Boise weather actually does to decking: UV, heat, dry air and a hundred-plus freezing nights a year.

material guides
6
nights ≤ 32°F a year in Boise
108
annual precipitation
11.51 in

Offer$500 off + a free 3D layout

Get a deck estimate

All fields are required.

Prefer to talk? Call or text (208) 330-5348

Submitting this form does not book an appointment.

Why these guides are different

Written for Treasure Valley decks

Boise averages more than a hundred freezing nights and dozens of 90-degree days a year, with dry air that pulls moisture out of wood fast. That combination is hard on decking in ways national comparisons rarely mention. These guides compare boards and railings on what matters here: heat underfoot, UV fading, checking and splitting, maintenance schedules, fire listings for Foothills lots, and cost over the life of the deck.

Boise design criteria & climate
Permit needed above
12 in
Frost depth
24 in
Ground snow load
20 psf
Design wind
90 mph
Nights ≤ 32°F / yr
108
Annual precip
11.51 in

Sources: City of Boise — Residential Construction brochure; City of Boise — current codes & design criteria; NOAA NCEI U.S. Climate Normals 1991–2020, Boise Air Terminal (USW00024131)

Composite deck board laid beside a cedar board and a pressure-treated board for comparison

Start here

Composite vs wood decking: which is better for a Boise deck?

Capped composite costs more up front, about $40–$62 per square foot installed against $25–$40 for pressure-treated pine and $30–$48 for cedar in 2026 market ranges, but it skips the stain cycle that Boise sun and dry air demand. Wood costs less and stays cooler underfoot; composite holds its color with washing alone.

All material guides

At a glance

Four decking materials, priced and compared

Installed cost per square foot from the same cost model the calculator uses, with what each board asks of you in Boise sun and dry air.

Price a deck in each material
Ranges reflect published 2026 Treasure Valley and national installed-cost data, not a Valley Decks quote. Your price depends on size, height, access, footings, railing, stairs and permit scope — we confirm it in writing after an on-site measure.
MaterialInstalled per sq ftWhat to know in the Treasure Valley
Pressure-treated pine$25–$40Lowest upfront cost; needs cleaning and re-staining every 2–3 years in Boise's sun and dry air.
Western red cedar$30–$48Naturally rot-resistant and stable; still needs a penetrating finish to slow graying and checking.
Capped composite (e.g. Trex, TimberTech, Fiberon)$40–$62No staining; capped boards resist fading and staining. Darker colors run hotter in July sun.
PVC / cellular (e.g. AZEK)$55–$78Lightest, most moisture-proof boards with the longest warranties; highest material cost.

Sources: Iron Crest Remodel — Boise deck pricing (2026); HomeGuide — Composite decking prices (2026); HomeGuide — Cedar decking cost (2026); HomeGuide — Pressure-treated decking cost (2026); Remodeling / JLC Cost vs. Value 2025 — Mountain region

Common questions from our material guides

Does composite decking get hotter than wood?
Yes, as a rule. Composite and PVC boards absorb and hold more heat than wood of a similar shade, and dark colors are the worst. Both Trex and TimberTech state that their decking gets hot in direct sun even with heat-reducing technology. On a sunny Boise deck, lighter colors, heat-reducing lines or shade make the difference.
Is Trex or TimberTech cheaper?
At the entry tier they are close. HomeGuide's 2026 figures put installed Trex at about $45–$70 per square foot and TimberTech composite at about $40–$70, with AZEK PVC higher. Local stock, color and the specific line move the price more than the brand does, so compare quotes for matching tiers.
Is PVC decking better than composite?
Better at some things, not all. PVC handles constant moisture, weighs less and, in certain lines, carries stronger fire ratings and longer product warranties. Composite costs less and offers a wider range of colors and price tiers. For a raised deck with good airflow and no fire-zone requirement, composite is usually enough.
How often should you stain a cedar deck?
In Boise, plan on every two to three years for boards in full sun, with railing caps and stair treads checked yearly. Shaded areas can go longer. Watch for water that soaks in instead of beading and for color fading to gray; either means the finish has worn through. Follow the specific stain's re-coat guidance.
What does new deck railing cost per foot?
In Fixr's national table (January 2023), installed railing costs $30–$50 a linear foot in wood, $45–$85 in metal, $80–$165 in composite, $115–$175 in cable and $140–$210 in glass. Tearing out an old rail, replacing rotten posts and adding angled stair sections push a replacement above those figures, and prices have climbed since 2023.
Does composite decking get too hot to walk on barefoot?
On a 90°F afternoon in full sun, dark composite can be uncomfortable or too hot for bare feet, and Trex and TimberTech both warn that all decking gets hot in direct sun. Light colors, heat-reducing lines and shade make a real difference. Test samples in your own sun before deciding.

How it works

From estimate to first barbecue

How we build a deck, step by step
  1. Estimate request

    Size, material, height, timing — rough numbers are fine.

  2. Site measure & design

    We measure, check the house attachment and slope, and sketch options.

  3. Permit & HOA

    Drawings for the city when the deck needs a permit, and a submittal package for your HOA.

  4. Build

    Footings, framing, inspections, decking, railing and stairs — in that order, no shortcuts.

  5. Walkthrough

    A final walk of the deck with care instructions for Treasure Valley seasons.

Ready for step one? Request an estimate.

Next step

Ready to price your deck?

Tell us the size, the material you're leaning toward and when you'd like it built. We'll follow up to schedule an on-site measure.

CallGet a deck estimate