The homes and lots in North End
Early-1900s bungalows, Queen Anne cottages and clapboard houses on narrow alley lots. The city's district description lists Queen Anne, Bungalow, Tudor Revival, Colonial Revival and Ranch styles built of local sandstone, brick and wood, with a period of significance from 1891 to 1915. Original lots measured 25 by 122 feet, or 30 feet wide on corners, and most early buyers combined two or three, which is why 50- and 75-foot frontages are typical now. Blocks west of Harrison Boulevard generally hold fewer buildings than the tighter blocks around 6th, 7th and 8th streets. Early leapfrog development left gaps that were filled decades later, so a mid-century or contemporary house can sit between two contributing bungalows. Build Idaho's 2026 market guide put North Boise's 2025 new-home median near $1.29 million, a measure of how much remodeling and infill money moves through these streets.
- Historic district review
Most of the neighborhood lies inside the North End Historic District, which Boise designated in 1994 and expanded in 2004. The Harrison Boulevard Historic District (National Register 1980, local district 1989) runs through it, and the Hyde Park district covers the commercial blocks on 13th Street. Inside these districts the city lists constructing a deck, and removing a tree, among projects that need a Certificate of Appropriateness, and the certificate must be issued before the building permit application. Work judged minor at concept review is decided by staff within 15 days and followed by a 10-day appeal period; major work goes to a public hearing. The terrain is flat, so the Hillside Development Overlay is not a factor below the foothills edge, and there is no subdivision HOA. Boise's 12-inch deck permit threshold applies on every lot, and parcels on the 13th Street commercial strip can also fall under the Hyde Park Character Overlay.
What a North End deck has to account for
- Design for the review you are going to get. Staff and the Historic Preservation Commission judge projects against the city's Historic Preservation Guidelines, and the decks that move fastest are low, behind the house, and quiet in material and color. A stair landing visible from the street, a wraparound on a corner lot, or a platform that rises above an alley garage roof all invite more discussion and, sometimes, a hearing.
- Assume the house cannot carry a ledger until proven otherwise. Homes from the 1890s to the 1910s often sit on sandstone or rubble foundations with balloon framing and several generations of siding over the original sheathing, so there may be no rim joist worth bolting to. A freestanding deck with its own beam a short step off the wall avoids the problem entirely, and it keeps the historic wall intact, which reviewers tend to appreciate.
- The back door often sits higher than it looks. Many North End houses stand on crawlspaces with the rear entry two to three feet above the yard, so even a modest landing deck crosses Boise's 12-inch line and needs a building permit as well as historic approval. Replacing an old back porch with a deck counts as constructing a porch or deck on the city's Certificate of Appropriateness list.
- Narrow lots change the logistics. With 50-foot frontages and tight side yards, materials usually come in from the alley, footings are often dug by hand, and the setback lines Planning confirms at 208-608-7100 can leave less room than the yard suggests. Rear-yard decks that leave space for the alley garage, trash pickup and utility meters get built with fewer change orders. Corner lots, originally 30 feet wide, add a second street-facing side that historic review will look at.
- Trees are protected and they are also in the way. Removing a tree in a historic district requires its own Certificate of Appropriateness, so footings are laid out around root zones and beams can span farther to skip a big root. Under that canopy, decks collect leaves and stay shaded, which favors capped boards with wide enough gaps to drain debris and a frame with joist tape on top.
- Harrison Boulevard lots carry their own design goals. The boulevard was laid out in 1891 along an alternate route of the Oregon Trail and named for President Benjamin Harrison, and its uninterrupted parkway of ornamental pear trees and streetlights is what the district protects. The city's goals for it call for keeping rear alleys and the line of street setbacks and respecting street trees and parkway plantings, so a deck there belongs firmly in the back yard, served from the alley side during construction.
- Hyde Park blocks mix homes with the 13th Street shops. The Hyde Park and Brumback additions were platted in 1891 alongside a new streetcar line, and the commercial center at 13th and Eastman was zoned for business in Boise's first zoning ordinance in 1928. Houses just behind the strip share alleys with businesses, so deliveries, parking and noise shape where a deck and its privacy screening go, and lots fronting 13th Street can also fall under the Hyde Park Character Overlay.
- Material choice is a conversation with staff, not a rule we can quote. Painted wood guards with simple square balusters and muted decking colors read as compatible on most bungalows; a low rear deck in a capped composite with a wood-tone or gray finish is often acceptable when it cannot be seen from the street. We bring samples to the concept review rather than guessing.
Around: Camel's Back Park · Hyde Park (13th & Eastman) · Harrison Boulevard · Fort Street · Hill Road · Hulls Gulch Reserve
North End deck questions
- Do I need historic approval to build a deck in the North End?
- If your lot is inside the North End, Harrison Boulevard or Hyde Park historic district, yes. Boise lists constructing an addition, porch or deck among projects that need a Certificate of Appropriateness, and noncontributing houses inside a district are covered too. The certificate comes before the building permit. The city's historic survey search confirms whether your house is contributing, which can affect how the design is judged.
- How much time does historic review add to a North End deck?
- For work treated as minor, staff have 15 days to review, neighbors are notified, and a 10-day appeal period follows the decision before the building permit can be filed, so roughly a month on top of permitting. Larger or street-visible designs go to a public hearing with an application cutoff date, which can add another month or more depending on the calendar. Submitting a complete concept with photos, a site plan and material samples is the simplest way to stay on the staff-review track.
- Can a deck attach to a 100-year-old North End house?
- Sometimes, but many of these houses have foundations and framing that cannot take a modern flashed, through-bolted ledger without opening the wall. A freestanding deck supported on its own beam and posts next to the house is often simpler, protects the historic wall and avoids hidden repair costs. We check the rim and foundation before committing to either approach.
- Can I remove a tree to make room for a deck in the North End?
- Removing a tree in a Boise historic district needs its own Certificate of Appropriateness, and mature canopy is part of what the district protects. It is usually faster to design around the tree: shift footings out of the root zone, use a longer beam span, or step the deck around the trunk. We plan the layout that way before asking for a removal.
- Can I use composite decking on a historic North End home?
- Often, on a low rear deck that cannot be seen from the street, but it is a judgment staff make against the Historic Preservation Guidelines rather than a published yes or no. Muted wood-tone or gray capped boards with painted wood guards and simple square balusters read as compatible on most bungalows. Bringing physical samples and a photo of the rear elevation to concept review settles it quickly.
- Does a small back-door landing need a building permit in the North End?
- It does once any part of it is more than 12 inches above grade, which is Boise's deck threshold, and many North End back doors sit two to three feet up. Historic approval is a separate requirement that applies to decks and porches inside the districts. The landing also has to meet guard, stair and landing dimensions, so it is worth drawing properly even when small.
Sources
- City of Boise — North End Historic District
- City of Boise — Harrison Boulevard Historic District
- City of Boise — Hyde Park Historic District
- City of Boise — Certificate of Appropriateness
- City of Boise — Hyde Park Character Overlay
- City of Boise — Residential Construction guide
- City of Boise — Camel's Back Park
- Build Idaho — 2026 guide to new-home prices across the Boise metro
Last reviewed .